top of page
IMG_0284 (1).JPG
Oak DAm (1).JPG
IMG_0294 (1).JPG
IMG_0282 (2).JPG
Engineers

OAK DAM

Project Overview

All Gen Solutions delivered the supply, installation, and commissioning of three prime power generators at the Oak Dam exploration camp. The scope included two 400kVA units and one 318kVA unit, upgraded with advanced control and synchronisation systems. Our team provided full turnkey delivery covering equipment supply, logistics, installation, and commissioning. Remote monitoring was integrated to ensure reliable performance and ongoing visibility.

We also established a structured service and maintenance program to support long-term reliability. Minor servicing was scheduled every 500 hours, alongside quarterly major services with full inspections and system tuning. The program ensures optimal performance in changing site conditions and reduces downtime risk. With this project, All Gen Solutions demonstrated its expertise in delivering dependable energy solutions for remote operations.

bottom of page